Drone Site Assessment Back to Training

Mission Briefing

Operation:
Target Area:
Date/Time:
Intel Requirement:
Asset:
C2 Link Budget:
Visual Assessment:

Obstacle Clearance

  • 30 ft safety bubble around launch
  • 50 ft horizontal from obstacles
  • Cell towers/power lines are critical hazards

RF Safety Margin

  • C2 link must be 15-20 dB stronger than interference
  • Margin = (C2 Budget) - (Interference)

RF Scan Data

Noise Floor:
Frequency (MHz)Strength (dBm)Description

GO/NO-GO Checklist

1. Most critical interfering signal:
2. C2 safety margin > 15 dB?
3. Mission-critical signals (GPS) jammed?
4. Launch zone clear of physical hazards?
5. Final Recommendation: